You may also like...

3 Comments

  1. Rev. Olagunju says:

    What’s is the status with the installation?

    1. Great day sir, pls confirm installation location for the 2HP?

    2. midea says:

      Great day sir,
      Additional items needed that the electrical contractor can help us with including the socket point required at Lighthouse corridor –

      15 amp socket 3pcs
      15 amp plug 4pcs

Leave a Reply

Your email address will not be published. Required fields are marked *